Since 1 April 2026, NSW strata schemes must use the new mandatory standard form for 10-year capital works fund plans. A major update: owners corporations are now required to consider sustainability infrastructure when estimating costs and planning works.

 

Key Sustainability Requirements

The standard form prompts schemes to factor in potential costs for:

  • Solar panels and renewable energy systems
  • Energy-efficient upgrades (LED lighting, efficient HVAC, insulation)
  • Electric vehicle (EV) charging infrastructure
  • Water-saving measures (rainwater systems, efficient fixtures)
  • Sustainable materials and smart metering

These don’t have to be installed immediately, but plans must account for likely timing and expenses to reduce long-term utility costs and align with NSW net-zero goals.

 

Practical Implications

  • Existing plans remain valid until reviewed
  • Sustainability is now a standing AGM agenda item (energy/ water consumption review)
  • Registered GST schemes can claim input tax credits on green updates, improving net cost estimates.

 

How to Prepare

  1. Download the new standard form from nsw.gov.au or Strata Hub.
  2. Review your current plan against the template.
  3. Discuss potential sustainability upgrades during your next AGM.
  4. Engage a quantity surveyor for accurate lifecycle costing of sustainability items and integration and upgrade of your existing 10-year capital works fund plan into the new prescribed standard form.

 