• T: 02 9586 4401
  • E: admin@archi-qs.com.au
  • Home
  • About Us
  • Quantity Surveying
    • Bank Reports
    • Building Condition Reports
    • Cost Planning
    • Embodied Emissions Reporting
    • Estimated Development Cost (EDC)
    • Gross Floor Area Validation Reports
    • Planning Portal Management
  • Strata Services
    • Asbestos Register and Management Plans
    • Capital Works Plans
    • Child Safety Lock Audit
    • Dilapidation Reports
    • Initial Maintenance Schedules
    • Insurance Valuations
    • Initial Maintenance Schedule and Initial Levy Certification
    • Playground Equipment Safety Audit
    • Safety Reports
    • Self-Managed Strata Schemes NSW
    • Shared Facilities Services
  • SBBIS
  • Tax Depreciation
    • What is Tax Depreciation
    • Case Studies
    • FAQ
    • Apply Now
  • Design Practitioner
  • Portfolio
  • Insights & News
  • Contact Us

Introduction to Stage 5 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 5 of the Strata Building Bond and Inspections Scheme requires that the building inspector go back out to site to carry out a final inspection and report. This is to determine whether the defective building work identified in the interim report has been...

Introduction to Stage 4 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 4 of the Strata Building Bond and Inspections Scheme is the rectification of the defects identified in Stage 3: Interim inspection and report. The developer is responsible to rectify the defects identified in the Interim Report, who will liaise with the builder....

The Design and Building Practitioners Act 2020 and Class 2 Buildings

by Archi-QS | Aug 4, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What types of projects does the The Design and Building Practitioners Act 2020 (DBP) Act apply to? The DBP Act applies to class 2 buildings or buildings that contain a class 2 component. Under the Building Code of Australia (BCA), Class 2 is classified as a multi-unit...

Introduction to Stage 3 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Jul 22, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 3 of the Strata Building Bond and Inspections Scheme involves the interim inspection carried out by the appointed building inspector and a report documenting the defects findings of the inspection. This report must be completed within 15 to 18 months of the date...

Introduction to Stage 2 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Jul 22, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 2 of the Strata Building Bond and Inspections Scheme calls for the developer to appoint a building inspector within 12 months of the issue of an Occupation Certificate (OC). The OC allows people to occupy the building and deems the project practically complete....

The Design and Building Practitioners Act 2020 (DBP) Act Key Takeaways

by Archi-QS | Jun 30, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What is the DBP? The Design and Building Practitioners Act 2020 (DBP) Act regulates design and building work in NSW by imposing certain obligations on Design, Building and Engineering Practitioners. The DBP Act covers class 2 buildings and buildings that include a...
« Older Entries
Next Entries »

Recent Posts

  • Sustainability in NSW, 10-Year Capital Works Fund Plan: What Changes From April 2026
  • A Quick Look at the New 10-Year Capital Works Fund Plan Reforms (Starting 1 April 2026)
  • Understanding Building Management Committees: Shared Facilities and Fair Allocation in Mixed-Use Developments
  • Summary of What the New Initial Maintenance Standard Form Includes
  • Introducing the New Independent Surveyor Certification Requirements for IMS and Levy Estimates (Starting 1 April 2026)

Categories

  • All Posts
  • Architecture
  • Cost Planning
  • Council Cost Reports
  • Insurance Valuations
  • Project Management
  • Quantity Surveying
  • Strata Building Bond and Inspection Scheme
  • Strata Services
  • Tax Depreciation
  • Updates, Insights & Thoughts

HEAD OFFICE

Level 1, Tower 1 / 201
Sussex Street,
Sydney NSW 2000
(02) 9586 4401
admin@archi-qs.com.au

QUICK LINKS

About Us
Building Consultancy + Cost Planning
Design Practitioner
Financier Quantity Surveying
SBBIS
Strata Services
Tax Depreciation
Insights & News

 

 

FOLLOW US

  • Follow
  • Follow
  • Follow
Nominated Architect
Sarah Bozionelos No.10024