02 9586 4401 admin@archi-qs.com.au
Archi-QS
  • Home
    • Our people
    • Awards
    • Publications
    • Affiliations
  • Quantity surveying

    • Bank reports
    • Building condition reports
    • Cost planning
    • Embodied emission statements
    • Estimated development cost
    • GFA validation reports
    • Planning portal management

    Strata services

    • Asbestos registers
    • Capital works plans
    • Child safety lock audits
    • Dilapidation reports
    • Insurance valuations
    • Playground safety audits
    • Safety reports
    • Self-Managed Strata Schemes NSW
    • Shared facilities reviews
    • Shared facilities mapping

    Specialist services

    • Design practitioner remedial works
    • Initial Maintenance Schedules
    • SBBIS
    • Tax depreciation
    Not sure which service you need?
    Talk to our team
  • Portfolio
  • Insights
  • Contact

Introduction to Stage 5 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 5 of the Strata Building Bond and Inspections Scheme requires that the building inspector go back out to site to carry out a final inspection and report. This is to determine whether the defective building work identified in the interim report has been...

Introduction to Stage 4 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 4 of the Strata Building Bond and Inspections Scheme is the rectification of the defects identified in Stage 3: Interim inspection and report. The developer is responsible to rectify the defects identified in the Interim Report, who will liaise with the builder....

The Design and Building Practitioners Act 2020 and Class 2 Buildings

by Archi-QS | Aug 4, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What types of projects does the The Design and Building Practitioners Act 2020 (DBP) Act apply to? The DBP Act applies to class 2 buildings or buildings that contain a class 2 component. Under the Building Code of Australia (BCA), Class 2 is classified as a multi-unit...

Introduction to Stage 3 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Jul 22, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 3 of the Strata Building Bond and Inspections Scheme involves the interim inspection carried out by the appointed building inspector and a report documenting the defects findings of the inspection. This report must be completed within 15 to 18 months of the date...

Introduction to Stage 2 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Jul 22, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 2 of the Strata Building Bond and Inspections Scheme calls for the developer to appoint a building inspector within 12 months of the issue of an Occupation Certificate (OC). The OC allows people to occupy the building and deems the project practically complete....

The Design and Building Practitioners Act 2020 (DBP) Act Key Takeaways

by Archi-QS | Jun 30, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What is the DBP? The Design and Building Practitioners Act 2020 (DBP) Act regulates design and building work in NSW by imposing certain obligations on Design, Building and Engineering Practitioners. The DBP Act covers class 2 buildings and buildings that include a...
« Older Entries
Next Entries »

Recent Posts

  • What Documents Does a QS Need to Prepare a Tax Depreciation Schedule?
  • 10-Year Capital Works Fund Plan for NSW
  • Understanding The NSW Housing Delivery Authority (HDA) Pathway
  • Why Employment Estimates Matter in Estimated Development Cost (EDC) Reports for SSD Applications
  • Tips On Setting A Reasonable 10-Year Capital Works Fund Plan, Initial Maintenance Schedule and Admin Levy in Year 1

Categories

  • All Posts
  • Architecture
  • Cost Planning
  • Council Cost Reports
  • Insurance Valuations
  • Project Management
  • Quantity Surveying
  • Strata Building Bond and Inspection Scheme
  • Strata Services
  • Tax Depreciation
  • Updates, Insights & Thoughts
Archi-QS
  • Follow
  • Follow
  • Follow
Nominated Architect
Sarah Bozionelos No.10024

Privacy Policy  |  Terms of Service

© 2026 Archi-QS. All rights reserved.

HEAD OFFICE

Level 1, Tower 1 / 201
Sussex Street,
Sydney NSW 2000
(02) 9586 4401
admin@archi-qs.com.au

QUICK LINKS

Our People

Tax Depreciation

Initial Maintenance Schedule

Quantity Surveying

Strata Services

SBBIS

Design Practitioner

Portfolio

Insights & News