• T: 02 9586 4401
  • E: admin@archi-qs.com.au
  • Home
  • About Us
  • Quantity Surveying
    • Bank Reports
    • Building Condition Reports
    • Cost Planning
    • Embodied Emissions Reporting
    • Estimated Development Cost (EDC)
    • Gross Floor Area Validation Reports
    • Planning Portal Management
  • Strata Services
    • Asbestos Register and Management Plans
    • Capital Works Plans
    • Child Safety Lock Audit
    • Dilapidation Reports
    • Initial Maintenance Schedules
    • Insurance Valuations
    • Initial Maintenance Schedule and Initial Levy Certification
    • Playground Equipment Safety Audit
    • Safety Reports
    • Self-Managed Strata Schemes NSW
    • Shared Facilities Services
  • SBBIS
  • Tax Depreciation
    • What is Tax Depreciation
    • Case Studies
    • FAQ
    • Apply Now
  • Design Practitioner
  • Portfolio
  • Insights & News
  • Contact Us

Introduction to Stage 7 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 20, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Introduction to Stage 6 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 20, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 6 of the Strata Building Bond and Inspections Scheme is agreeing to the cost of the outstanding defects and is therefore only applicable if outstanding defects that have been identified in the previous Stage 5: Final Inspection and Report. This stage must be...

Introduction to Stage 5 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 5 of the Strata Building Bond and Inspections Scheme requires that the building inspector go back out to site to carry out a final inspection and report. This is to determine whether the defective building work identified in the interim report has been...

Introduction to Stage 4 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 4 of the Strata Building Bond and Inspections Scheme is the rectification of the defects identified in Stage 3: Interim inspection and report. The developer is responsible to rectify the defects identified in the Interim Report, who will liaise with the builder....

Tax Depreciation: Split Ownership Reports Explained

by Archi-QS | Aug 4, 2021 | All Posts, Quantity Surveying, Tax Depreciation

At Archi-QS, we have adapted our schedules to suit the needs of our clients. This includes offering split reports where there are multiple owners of a particular property. The split report increases the immediate write-off and low-value pooling amounts claimable by...

The Design and Building Practitioners Act 2020 and Class 2 Buildings

by Archi-QS | Aug 4, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What types of projects does the The Design and Building Practitioners Act 2020 (DBP) Act apply to? The DBP Act applies to class 2 buildings or buildings that contain a class 2 component. Under the Building Code of Australia (BCA), Class 2 is classified as a multi-unit...
« Older Entries
Next Entries »

Recent Posts

  • Sustainability in NSW, 10-Year Capital Works Fund Plan: What Changes From April 2026
  • A Quick Look at the New 10-Year Capital Works Fund Plan Reforms (Starting 1 April 2026)
  • Understanding Building Management Committees: Shared Facilities and Fair Allocation in Mixed-Use Developments
  • Summary of What the New Initial Maintenance Standard Form Includes
  • Introducing the New Independent Surveyor Certification Requirements for IMS and Levy Estimates (Starting 1 April 2026)

Categories

  • All Posts
  • Architecture
  • Cost Planning
  • Council Cost Reports
  • Insurance Valuations
  • Project Management
  • Quantity Surveying
  • Strata Building Bond and Inspection Scheme
  • Strata Services
  • Tax Depreciation
  • Updates, Insights & Thoughts

HEAD OFFICE

Level 1, Tower 1 / 201
Sussex Street,
Sydney NSW 2000
(02) 9586 4401
admin@archi-qs.com.au

QUICK LINKS

About Us
Building Consultancy + Cost Planning
Design Practitioner
Financier Quantity Surveying
SBBIS
Strata Services
Tax Depreciation
Insights & News

 

 

FOLLOW US

  • Follow
  • Follow
  • Follow
Nominated Architect
Sarah Bozionelos No.10024