02 9586 4401 admin@archi-qs.com.au
Archi-QS
  • Home
    • Our people
    • Awards
    • Publications
    • Affiliations
  • Quantity surveying

    • Bank reports
    • Building condition reports
    • Cost planning
    • Embodied emission statements
    • Estimated development cost
    • GFA validation reports
    • Planning portal management

    Strata services

    • Asbestos registers
    • Capital works plans
    • Child safety lock audits
    • Dilapidation reports
    • Insurance valuations
    • Playground safety audits
    • Safety reports
    • Self-Managed Strata Schemes NSW
    • Shared facilities reviews
    • Shared facilities mapping

    Specialist services

    • Design practitioner remedial works
    • Initial Maintenance Schedules
    • SBBIS
    • Tax depreciation
    Not sure which service you need?
    Talk to our team
  • Portfolio
  • Insights
  • Contact

Introduction to Stage 8 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 20, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 8 of the Strata Building Bond and Inspections Scheme is the final stage. It is only relevant if the final inspection and report identified outstanding defects and the cost to rectify the defects has been determined. The building bond amount is equivalent to the...

Introduction to Stage 7 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 20, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Introduction to Stage 6 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 20, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 6 of the Strata Building Bond and Inspections Scheme is agreeing to the cost of the outstanding defects and is therefore only applicable if outstanding defects that have been identified in the previous Stage 5: Final Inspection and Report. This stage must be...

Introduction to Stage 5 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 5 of the Strata Building Bond and Inspections Scheme requires that the building inspector go back out to site to carry out a final inspection and report. This is to determine whether the defective building work identified in the interim report has been...

Introduction to Stage 4 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 4 of the Strata Building Bond and Inspections Scheme is the rectification of the defects identified in Stage 3: Interim inspection and report. The developer is responsible to rectify the defects identified in the Interim Report, who will liaise with the builder....

Tax Depreciation: Split Ownership Reports Explained

by Archi-QS | Aug 4, 2021 | All Posts, Quantity Surveying, Tax Depreciation

At Archi-QS, we have adapted our schedules to suit the needs of our clients. This includes offering split reports where there are multiple owners of a particular property. The split report increases the immediate write-off and low-value pooling amounts claimable by...
« Older Entries
Next Entries »

Recent Posts

  • What Documents Does a QS Need to Prepare a Tax Depreciation Schedule?
  • 10-Year Capital Works Fund Plan for NSW
  • Understanding The NSW Housing Delivery Authority (HDA) Pathway
  • Why Employment Estimates Matter in Estimated Development Cost (EDC) Reports for SSD Applications
  • Tips On Setting A Reasonable 10-Year Capital Works Fund Plan, Initial Maintenance Schedule and Admin Levy in Year 1

Categories

  • All Posts
  • Architecture
  • Cost Planning
  • Council Cost Reports
  • Insurance Valuations
  • Project Management
  • Quantity Surveying
  • Strata Building Bond and Inspection Scheme
  • Strata Services
  • Tax Depreciation
  • Updates, Insights & Thoughts
Archi-QS
  • Follow
  • Follow
  • Follow
Nominated Architect
Sarah Bozionelos No.10024

Privacy Policy  |  Terms of Service

© 2026 Archi-QS. All rights reserved.

HEAD OFFICE

Level 1, Tower 1 / 201
Sussex Street,
Sydney NSW 2000
(02) 9586 4401
admin@archi-qs.com.au

QUICK LINKS

Our People

Tax Depreciation

Initial Maintenance Schedule

Quantity Surveying

Strata Services

SBBIS

Design Practitioner

Portfolio

Insights & News